Customization: | Available |
---|---|
Color: | Red |
Appearance: | Powder |
Still deciding? Get samples of US$ 50/kg
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1. Good drainage performance and slip resistance;
2. Excellent road performance, reducing noise, and improving driving comfort;
3. Protect the environment and facilitate subsequent cleaning and maintenance..
Base course treatment:First, clean the concrete base course, reach a strength of C20 or above, cut the expansion joint, and keep it dry;
Primer:Mix agent A and agent B of SPR-61010P cold mixed permeable asphalt material evenly according to the ratio, and evenly coat the dry base surface with a roller to increase adhesion;
Paving:
a, Conduct setting out and formwork erection on site according to the design;
b,Fully mix the stones and SPR-61010P cold mixed permeable asphalt material evenly in proportion;
C,Paving, scraping, trimming, and compacting permeable asphalt materials;
d,After 48 hours of curing, cut the expansion joint;
Finish:Spray SPR-62204P PU color finish paint (dipropylene polyurethane) as required.